This is a bird's eye view of our house from a mapping site, as I didn't take a picture from the right angle prior to the work starting. You can see the front dormers in the first entry to the blog, and the rear ones are pretty similar although less central on the roof and less wide:

This is the first pitched gable structure being constructed over the bathroom window (as seen from a driveway further down the road):

This is the wider pitched gable being constructed over the bedroom window:

This is them working up on the scaffold, starting to prepare the new gables for tiling:

This is the front of the wider gable which has been completed in wood reclaimed from the garage roof:

Here the first coat of the white stucco has been painted onto the small gable, and the sides have been completed too:

And here the wider gable has been painted with the stucco:

And here they have barge boards and gutters, and are completed:

There are two more to do on the front of the property, and two velux roof lights to insert to complete the roof works. The scaffold has been moved round the front of the property for when they have a chance (and good enough weather) to do the rest.
No comments:
Post a Comment