Well, there was Christmas, and then work resumed. The foundations for the new garage were dug, and the based was levelled:

The damp proof membrane was laid out:

Then the concrete was poured down a carefully constructed extended chute:

Then it was levelled:

Then the plain back walls were built:

And the front walls, complete with door and window:

And then the weather had other ideas:

This cold snap delayed things by a couple of weeks, as you can't lay bricks below 2 degrees! But eventually things began to progress again and the walls were upto plate level and the roof trusses were lifted into place:

Meanwhile, lots of things had been happening indoors...